+421 917 480 367

KIA Žilina Engine Plant Opening 2011

otvarania_motorarne_kia_zilina_2011_2

On 29.9. we took part in delivering the opening of the KIA Žilina engine plant. It was the opening of a new production hall for manufacturing engines. The event was attended by top representatives of the carmaker as well as Prime Minister Iveta Radičová.

We provided for the event:

  • Tent 15×20m
  • Tent 10×15m
  • Small tents 3×3m and 6×3m
  • VIP chairs including covers and bows
  • Ceiling and side decorations
  • Flooring for party tents
  • Access carpets and steps